APES Demolitions Logo
Loading...

🎉 Get 10% OFF Your First Demolition Project! Call Now: (484) 657-9230

Radnor Township Kitchen Demolition

Your Complete Guide to Kitchen Renovation Demolition

Kitchen renovations are the most popular home improvement project in Radnor Township's beautiful Main Line communities. Whether you're updating a kitchen in a historic Radnor home or completely redesigning a space in a newer property, professional demolition is the critical first step that sets the stage for your dream kitchen.

APES Demolitions specializes in kitchen demolition throughout Radnor, Wayne, Villanova, and the surrounding Main Line areas. We understand the unique considerations of working in occupied homes, protecting your property, and coordinating with your contractor to keep your renovation on schedule.

Kitchen Demolition Scope

Cabinets & Countertops

Upper and lower cabinets, countertops (granite, quartz, laminate), backsplashes, and islands are carefully removed. We can salvage cabinets for donation if desired.

Appliances

Refrigerators, stoves, dishwashers, microwaves, and range hoods are disconnected and removed. We handle gas line disconnection safely and properly cap lines.

Flooring

Tile, hardwood, laminate, or vinyl flooring is removed down to the subfloor. We handle any type of kitchen flooring material.

Walls & Ceilings

For complete gut-outs, we remove drywall or plaster down to studs. Partial demolition removes specific walls for open-concept designs.

Protecting Your Radnor Home

Most Radnor families stay in their homes during kitchen renovations. We take extensive measures to protect your property and minimize disruption:

Dust Containment Barriers

Heavy plastic sheeting seals off the kitchen from the rest of your home. We create a complete barrier at all doorways and openings to contain dust and debris.

Floor & Stair Protection

Ram board and carpet protection covers floors and stairs along debris removal routes. Your hardwood floors and carpets stay pristine throughout the demolition.

Careful Debris Removal

Materials are carefully carried out through protected pathways. We avoid dragging items across floors and take care around doorways, railings, and walls.

Daily Cleanup

We clean thoroughly at the end of each day, removing all debris and vacuuming work areas. Your home stays as clean as possible during the project.

Kitchen Demolition Timeline

Most Radnor kitchen demolitions take 2-3 days depending on the scope:

1-2 Days

Cabinet & Countertop Only

Remove cabinets, countertops, and appliances. Flooring and walls remain.

2-3 Days

Complete Kitchen Demo

Cabinets, countertops, appliances, flooring, and backsplash removed.

3-4 Days

Complete Gut-Out

Everything removed including walls down to studs for major remodel.

Ready to Start Your Kitchen Renovation?

Get a free estimate for kitchen demolition in Radnor Township.

Request a Free Estimate

Get a Free Estimate

Fill out the form below and we'll get back to you as soon as possible.

By submitting this form, you agree to be contacted by APES Demolitions regarding your request.