
🎉 Limited Time Offer: Get 10% OFF Your First Demolition Project! Call Now: (484) 657-9230
Your Complete Guide to Kitchen Renovation Demolition
Kitchen renovations are the most popular home improvement project in Radnor Township's beautiful Main Line communities. Whether you're updating a kitchen in a historic Radnor home or completely redesigning a space in a newer property, professional demolition is the critical first step that sets the stage for your dream kitchen.
APES Demolitions specializes in kitchen demolition throughout Radnor, Wayne, Villanova, and the surrounding Main Line areas. We understand the unique considerations of working in occupied homes, protecting your property, and coordinating with your contractor to keep your renovation on schedule.
Upper and lower cabinets, countertops (granite, quartz, laminate), backsplashes, and islands are carefully removed. We can salvage cabinets for donation if desired.
Refrigerators, stoves, dishwashers, microwaves, and range hoods are disconnected and removed. We handle gas line disconnection safely and properly cap lines.
Tile, hardwood, laminate, or vinyl flooring is removed down to the subfloor. We handle any type of kitchen flooring material.
For complete gut-outs, we remove drywall or plaster down to studs. Partial demolition removes specific walls for open-concept designs.
Most Radnor families stay in their homes during kitchen renovations. We take extensive measures to protect your property and minimize disruption:
Heavy plastic sheeting seals off the kitchen from the rest of your home. We create a complete barrier at all doorways and openings to contain dust and debris.
Ram board and carpet protection covers floors and stairs along debris removal routes. Your hardwood floors and carpets stay pristine throughout the demolition.
Materials are carefully carried out through protected pathways. We avoid dragging items across floors and take care around doorways, railings, and walls.
We clean thoroughly at the end of each day, removing all debris and vacuuming work areas. Your home stays as clean as possible during the project.
Most Radnor kitchen demolitions take 2-3 days depending on the scope:
Remove cabinets, countertops, and appliances. Flooring and walls remain.
Cabinets, countertops, appliances, flooring, and backsplash removed.
Everything removed including walls down to studs for major remodel.
Fill out the form below and we'll get back to you as soon as possible.