Confirmed APES project · King of Prussia, PA
Selective House Demolition in King of Prussia, PA
Roughly one-quarter of a house in King of Prussia was sinking. APES safely removed the falling portion, separated it from the part of the house that remained, and removed the foundation beneath the removed section.
Project date not published
Case study published — not the job date.
The scope
What needed to be removed?
The affected portion was sinking and falling. Roughly one-quarter of the house needed to come out; the rest of the house was to remain.
- Selective demolition of roughly one-quarter of the house that was sinking.
- Separation of the falling portion from the retained house.
- Removal of the foundation beneath the removed portion.
The confirmed outcome
What remained after the removal?
The falling portion and its foundation were removed, while the rest of the house was retained. This was a partial house removal, not a complete teardown.
This case study describes the removal scope. It does not document a rebuilt or restored home.
Real project photos · Work in progress
What do the project photos show?
These user-supplied photos show the same project during demolition. They are work-in-progress views, not completed after photos or proof of a restored house.
Why was this selective demolition?
Only the affected portion was removed. APES separated the falling section from the retained house rather than taking down the entire home. Foundation removal was part of the scope beneath that section.
A sinking or falling structure requires a property-specific professional assessment. This is a project account, not instructions for attempting unstable demolition yourself.
Project scope and outcome are based on details confirmed by APES. The job date, exact address, customer identity, cost, and duration are not published.